A Ellery company - serving Van Nuys, CA
Ellery ADU Studio Van Nuys adu team

ADU Design & Permitting in Santa Monica - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU in Santa Monica, CA

Junior ADU and interior conversion in Santa Monica typically runs $85,000-$165,000 all-in, while site prep and utility work adds $15,000-$75,000 depending on whether we’re upgrading a 1920s electrical panel or trenching new plumbing laterals through compact coastal lots. We’re Ellery ADU Studio, and we handle both the permit set and the build under one contract at one written price - no designer-builder blame gap. Call (424) 523-8492 for a free estimate.

Call (424) 523-8492

Santa Monica’s 1920s-1940s bungalows in Ocean Park and the Pico neighborhood are built for this work: compact footprints, detached garages, and unused basements that convert cleanly to rental units. The catch is the Coastal Zone overlay and rent control complexities that can stall projects for months if your team doesn’t pull the right maps before quoting.

Why Santa Monica Homes Are Different

Santa Monica’s residential parcels split into two distinct regulatory worlds. A large share fall within California’s Coastal Zone, meaning ADU projects there require a Coastal Development Permit processed through the city’s certified Local Coastal Program - a layer of review that adds timeline and cost that simply does not apply to a nearly identical project one mile east in Culver City, CA. Experienced Santa Monica ADU contractors know to pull the city’s Coastal Zone map before quoting any job: an Ocean Park garage conversion that clears local zoning can still get stalled three months waiting for a CDP determination.

Layered on top, Santa Monica’s unusually strong local rent control ordinance creates complex legal questions about whether a newly built ADU on a rent-controlled parcel is subject to the Rent Control Charter, making attorney review essentially mandatory before breaking ground. Projects on lots with existing rent-controlled units may require the owner to record a Declaration of Restrictions with the Rent Control Board before the building department will issue a certificate of occupancy.

The housing stock itself drives the work. Those vintage bungalows routinely require subpanel upgrades to 200A, foundation assessments, and asbestos/lead abatement before the city will final an ADU permit. The persistent marine layer and salt-laden onshore flow accelerate corrosion on exterior fasteners, vents, mini-split condenser coils, and electrical enclosures in backyard ADUs, making stainless hardware and corrosion-rated HVAC equipment a practical necessity rather than an optional upgrade for units within a few blocks of the beach.

Our Main Santa Monica Services

These are the three services Santa Monica homeowners call about most.

ADU Design & Permitting in Santa Monica

Our permit set is the core product, not an afterthought. In Santa Monica, that means Coastal Zone determination, rent control compliance review, and a complete Title 24 energy package before the first wall opens. We handle the CDP pathway when required and coordinate with the Rent Control Board on restricted parcels. ADU Design & Permitting in Santa Monica is governed by Haven Standard Clause 1: written price before any work starts.

ADU Design & Permitting in Santa Monica

Garage Conversion ADU in Santa Monica

Detached garages on 50×150 foot lots are Santa Monica’s most common ADU conversion target. We assess slab thickness, roof structure, and setback compliance against the Coastal Zone map before quoting. Foundation upgrades, seismic anchoring, and corrosion-rated hardware for salt air are standard inclusions, not upsells. Garage Conversion ADU in Santa Monica runs as a single contract from measured drawings through final inspection.

Garage Conversion ADU in Santa Monica

New Detached ADU in Santa Monica

Backyard units on Santa Monica’s compact lots demand precise setback calculations and often a Coastal Development Permit. We specify prefab systems from Abodu, Cover, or Dvele when the timeline or site access demands it, coordinated under the same single contract as stick-built work. New Detached ADU in Santa Monica includes full utility trenching and connection in the written price.

New Detached ADU in Santa Monica
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (424) 523-8492

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.
BeforeBefore
AfterAfter

Junior ADU & Interior Conversion in Santa Monica

Technician installing HVAC system for a garage conversion ADU
Junior ADU & Interior Conversion in Santa Monica

Junior ADU and interior conversion in Santa Monica solves the problem of aging 1920s-1940s housing stock with underused square footage - basements, attached rooms, and above-garage spaces that can become independent rental units without expanding the building footprint. The work is particularly suited to Ocean Park and Pico neighborhood bungalows where lot coverage limits make detached construction difficult. We handle the full Junior ADU & Interior Conversion pathway: code analysis, permit set, construction, and final inspection under one written price.

Room-to-ADU Conversion

Signs you need it

You have a ground-floor bedroom or den with exterior access, a separate entrance, and you’re willing to add a small kitchenette and full bath within the existing footprint.

What it costs in Santa Monica

Room-to-ADU conversion in Santa Monica typically runs $85,000-$140,000 all-in, including the permit set, asbestos/lead assessment, kitchenette rough-in, and final inspection.

How we do it

We measure existing conditions, produce the permit set with Title 24 and accessibility compliance, then build to the drawings with a documented photo record on every visit.

Interior JADU

Signs you need it

You need a rental unit smaller than 500 square feet inside your existing home, with owner occupancy maintained on site, on a lot where detached construction isn’t feasible.

What it costs in Santa Monica

Interior JADU in Santa Monica typically runs $75,000-$125,000 all-in, including the permit set, utility separation, and fire-rated separation between units.

How we do it

We identify the JADU-eligible space, design the separation and independent utility meters, permit through the city, and build to the signed scope with no change orders.

What Junior ADU & Interior Conversion Costs in Santa Monica

Item Typical range in Santa Monica
Room-to-ADU conversion (all-in) $85,000-$140,000
Interior JADU (all-in) $75,000-$125,000
Above-garage ADU (all-in) $110,000-$165,000

Does a Junior ADU need a separate meter in Santa Monica?

Yes, Santa Monica requires independent electric and gas meters for JADUs, which we coordinate with SCE and SoCalGas during the permit phase. Call (424) 523-8492 for an exact quote - estimates are free.

Can I convert a basement to an ADU in Santa Monica’s Coastal Zone?

Basement conversions in the Coastal Zone require a CDP if any exterior work is visible from the beach side, but fully interior work with no facade changes may bypass it - we verify before quoting. Call (424) 523-8492 for an exact quote - estimates are free.

ADU Site Prep & Utilities in Santa Monica

Professionals reviewing ADU architectural blueprints and site maps on a laptop
ADU Site Prep & Utilities in Santa Monica

ADU site prep and utilities in Santa Monica means bringing 1920s-1940s infrastructure up to current code before the living space work begins: 100A panels that can’t handle a second unit, galvanized plumbing laterals that fail pressure tests, and foundations that need seismic retrofitting against salt-air corrosion. The marine layer accelerates deterioration of everything we expose, so we sequence the work to minimize open trenches and unprotected rough-ins. We coordinate all ADU Site Prep & Utilities under the same single contract as the build itself.

Electrical Panel Upgrade

Signs you need it

Your existing panel is 100A or less, has fused disconnects, or the main breaker trips when the AC and dryer run together.

What it costs in Santa Monica

Electrical panel upgrade to 200A in Santa Monica typically runs $4,500-$8,500, including the new panel, permit, and SCE coordination.

How we do it

We pull the permit, schedule SCE for the service upgrade, install the new panel with AFCI/GFCI breakers, and pass city inspection before rough-in begins.

Foundation & Grading

Signs you need it

Your garage slab is cracked, less than 4 inches thick, or the conversion scope requires a change in grade for accessibility compliance.

What it costs in Santa Monica

Foundation repair or replacement for ADU conversion in Santa Monica typically runs $8,000-$18,000, including soils testing when required by the city.

How we do it

We assess the existing slab, engineer a repair or replacement plan, pull the permit, and pour to the specified depth with proper vapor barrier and rebar.

What ADU Site Prep & Utilities Costs in Santa Monica

Item Typical range in Santa Monica
Electrical panel upgrade to 200A $4,500-$8,500
Foundation repair/replacement $8,000-$18,000
Plumbing lateral replacement $6,000-$14,000

Does Santa Monica require a soils report for ADU foundation work?

Soils reports are required for new detached ADUs and may be triggered for garage conversions if the existing slab shows significant cracking or the city geotech flags it - we order during permit review. Call (424) 523-8492 for an exact quote - estimates are free.

Can you trench utilities in Santa Monica without disrupting the street?

We use directional boring for sewer and water laterals when the street is narrow or parking is restricted, which preserves the surface but adds roughly 30% to the trenching line item - we specify the method in the written quote. Call (424) 523-8492 for an exact quote - estimates are free.

Get the price in writing before anything starts.Serving Santa Monica - a real person answers, day or night.
Call now

Brands We Service in Santa Monica

We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, and James Hardie within the same single contract as our stick-built work. Parts and warranty documentation are stocked locally through our Los Angeles office, with most replacement items available within 48 hours.

Pricing for ADU in Santa Monica, CA

Professional reviewing 3D architectural ADU design and site plans
Pricing for ADU in Santa Monica, CA
Service Typical range in Santa Monica
Room-to-ADU conversion (all-in) $85,000-$140,000
Interior JADU (all-in) $75,000-$125,000
Above-garage ADU (all-in) $110,000-$165,000
Basement ADU (all-in) $95,000-$155,000
Electrical panel upgrade to 200A $4,500-$8,500
Foundation repair/replacement $8,000-$18,000
Plumbing lateral replacement $6,000-$14,000
Gas line extension $3,500-$7,500

What pushes price up in Santa Monica: Coastal Development Permit requirements, rent control compliance review and Declaration of Restrictions recording, asbestos or lead abatement in pre-1978 housing, and corrosion-rated hardware and HVAC equipment for properties within salt-air range. Under Haven Standard Clause 1, every project is quoted with a written price before any work begins - no call-for-pricing, no door-side upsells.

Neighborhoods We Serve in Santa Monica

We work across Santa Monica’s full residential footprint, from the coastal bungalows of Ocean Park to the hillside streets north of Montana Avenue. Dispatch and scheduling are coordinated from our Los Angeles office; crews serve Santa Monica locally with next-day availability for estimates.

  • Ocean Park
  • Pico Neighborhood
  • Montana Avenue area
  • Northeast Santa Monica (Sunset Park)
  • Wilmont

Service Area - Cities Near Santa Monica

Designer and client reviewing architectural 3D ADU house plans on monitor
Service Area - Cities Near Santa Monica

We serve homeowners throughout the Westside and central Los Angeles basin. Our crews regularly work in Culver City, CA, Beverly Hills, CA, West Hollywood, CA, and Sherman Oaks, CA, with the same single-contract model and written-price guarantee.

Serving Santa Monica, CA - Our Local Coverage Area

We’re based in the Santa Monica area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Santa Monica

Professional applying spray foam insulation for garage conversion ADU project
FAQs About ADU in Santa Monica

Ready to get started? Free estimates · Free in-home estimates response in Santa Monica
Call (424) 523-8492

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Santa Monica Customers Say

★★★★★ 5.0 from 3+ reviews

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

- Odette N.

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in Santa Monica

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Santa Monica - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Santa Monica - we'll get back to you fast. No obligation.

By sending this request, you agree to our Privacy Policy and agree that you may be contacted by telephone, text message, or email about your service request, including from the local pros who may handle it.

Prefer to text? Text Us
Call Now - Fast Dispatch
Local Service Coverage
Call Now - Fast Dispatch